Sistan Water Pipeline Project

Subject of the Contract:
Implementation of water pipelines in Zahak, Milak, Hirmand, Benjar and Nimrooz cities of Sistan


Employer: Sistan and Baluchestan Water and Wastewater Company
Consultant: Toossab Consulting Engineers Company
Contractor: Saabniroo
Duration of Contract: 18 months

Project location: Sistan and Baluchestan Province - Zahak, Milak, Hirmand, Benjar and Nimrooz Cities


Project Description:

Supply and implementation of water transmission line, valve basins and river passages and canals with pipejacking:

- From GhaleNo collector to Zahak water reservoir with UPVC pipeline with a diameter of 710 mm and a pressure of 12.5 bar with a length of 9 km and a flow rate of 510 liters per second

- From Zahak city pumping station to Milak city water reservoir with UPVC pipeline with a diameter of 500 mm and a pressure of 16 bar with a length of 8 km and a flow rate of 180 liters per second

- From Milak water reservoir to Hirmand water reservoir with UPVC pipeline with a diameter of 355 mm and a pressure of 10 bar with a length of 11.5 km and a flow rate of 76 liters per second

- From the pumping station of the western zone of Zabol city to Nimroz pipeline with UPVC pipeline with a diameter of 400 mm and a pressure of 10 bar with a length of 6.2 km and a flow rate of 90 liters per second

- From Zabol city intersection to Zabol eastern pumping station with with UPVC pipeline with a diameter of 800 mm and a pressure of 10 bar with a length of 4.1 km and a flow rate of 650 liters per second

- From the pumping station of the eastern zone of Zabol to Benjar with a UPVC pipeline with a diameter of 225 mm and a pressure of 10 bar with a length of 6.5 km and a flow rate of 32 liters per second